Too little time for detailed updates

Had to deal with a freak storm.IMG_6478

Finishing the 2nd sublfoorIMG_0363

IMG_0381

Blocking is like weeding, there’s always more of it.

IMG_6621

IMG_6613 2

New load, the boom truck is borked so we’ll have to move this all up by hand. IMG_0476

More destruction, took forever with the roof in the way.IMG_0390

Building high off the ground can give you an interesting experience of the sky. A mix of being on a boat and ascending to the heavens.IMG_0411

2nd subfloor framing almost done

The platform for the stairs joins the vertical beam holding the subfloor. Through the magic of computer models, everything lines up perfectly. I never need to make calculations as I build, I cut where the 3D model tells me and I check to make sure I’m true to it. This is particularly useful for angles, I’ve impressed seasoned carpenters by laying all the pieces of a wall full of angles trusting they’ll all fit together in the end.

IMG_0162 3vertical beamIMG_0219 1