More Subfloor

I finished blocking and attaching to the house the 2 subfloors.

The 24’x12′ section weights a ton so I booped it in place with the tractor.

Checking for level, perfect!

Checking for square, could be better… The original 2015 tiny house and the 2017 addition aren’t perfectly orthogonal and so I have to find some compromises.

I started making trips to the lumber yard to get the next steps lined up. I’m going to try to insulate the subfloor right away from the top as opposed to crawling under later and doing it against gravity which is always tedious and miserable.

And after many, many screws and nails it all tightly made one with the existing structure. I want this to be solid, I tend to overkill fastening.

Subfloors

Not much to be said, as I said a while back, this blog is bound to become repeats without the enthusiasm of discovery. Don’t get me wrong we are excited to get more space, but the building process is very routine these days. In fact the experience is starting to show, what took me 2 days of work now takes a short one, and I’m less tired, and the result is better. It’s really nice to know what you’re doing.

Staging the boards

Cutting to length (12′ in this case). I can now wield this skilsaw one handed with great accuracy, such was not the case a few years back.

Working alone means more rigging

There are really 2 distinct subfloors to this project

June this year has been particularly perfect weather for building

And now, blocking…

But again, it went a lot easier with years of practice

That’s it for today 🙂

Put the Tin on

It took about 3 hours. I want to build another one before next Winter and I’m pretty sure I’ll adapt the way I built it, not the plan itself which worked just fine, just the order and methods for putting it together. I’ll try and publish a guide then. In the end, it takes a day to build, and it’s very sturdy.

Bill of material and plans bellow.

Bill of Material

  • 2x4x8 Pressure treated (2)
  • 2x4x8 (7)
  • 2x4x10 (16)
  • 8×3 tin panels (8)
  • any 3/4 thick cheap lumber for bracing (4)

Plan

quick_sturdy_shed.skp

Heavy Construction

I often joke that the siding I use for my house is more house. And well, this year will be no exception. The piers are in, more house will follow soon. The more experienced I am at all this, the more I procrastinate on the planning. I’m still figuring out the roof line but I did get the footprint in the nick of time for pier day.

Miscellaneous Construction

Deck Stairs

As always, but especially with stairs, figuring them out on a more malleable and fault tolerant medium saves a considerable amount of time. It helps get all the little details right too.

It will move with the ground frosts, and so it attached to the deck in a way that will allow for this.

A Door

This is the first door inside the house, and it’s going to the kid who started needing privacy. He still leaves it open at night because he’s not used to being isolated, he’s still just a little boy. We had to explain a few things about door use that are not obvious when you didn’t grow up with them. Being careful with where Esther’s fingers are when he closes it, or how not to close the cat in. He of course slammed it once, and I told him just as I had constructed the door, I would deconstruct it if he did that again. The threat was deemed plausible and it’s been honestly hilarious to see him ever so gently yet angrily close his door when he throws a pre-teen fit.

Pile-O-Clamps

I’ve been pushing the hickory flooring into one of the flights of stairs. It sure it nice to have an alternative when I turn one into a minefield such as this:

I had to buy more clamps…