Procrastinated Planning

Driven by necessity, I finalized the plan for construction 2022. I struggled pretty hard on this one, because I tried to figure out many ways to gain half a floor, and I had to think hard about snow management. Ultimately I ended up keeping it to just 1 floor because I do NOT want to mess with the existing tin roof. In Vermont currently contractors are impossible to get, let alone roofers who are notoriously difficult to begin with (and rightfully so). So it was always the plan that I’ll be doing the tin myself, and because of that, I really cannot mess with the existing roof. So this addition has an independent roof line which does not at all integrate with the existing one.

There were a couple of challenges to solve but in the end, it’s a pretty straightforward build. Nicole is getting a whole 12’x16′ all to herself to accommodate all the projects she’s spearheading on the homestead.